| 
 
 Henderson Weather
 
   Projects
 Hobby Hangar
					Hangar
 
 Check Mail
  
 Home
 Back
 ______
 
 
 Photo -1   		April 27, 2002  I have finally opened the boxes and am now beginning construction.
 
 Photo -2   The Elevator Servo cut-out was lowered 3/16" to allow the use of 1 1/4" servo arm NOTE:Rudder cut out filled in
 
 Photo -3,4   A 1/8" Lite Ply plate with a 1/4" plywood block was added to the inside bottom of the fuse to accomidate the mounting of the tail wheel
 
 Photo -5,6   Cowl attatchment is done similar to a Carden, with a ply ring glued inside the cowl which butts up to hardwood blocks glued to the front former
			Photo -7   All control surfaces hinged
 
 Photo -8   Motor box sides were severely warped.  Used ammonia (Windex) and weights for 2 days to straighten
 
 Photo -9   I built the Right Thrust into the motor box / firewall, so the pre-installed 3/8" balsa was not at the correct anglel
		I will re-add the balsa when the motor box top and bottom are installed
 
 Photo -10    Firewall is epoxied in and clamped
 
 Photo -11    Instrument panels - From Diamond Panels
 
 
 | 
 
 
   | 
 
 
 | 
 
 
   | 
 
 Photo -12,13    Fuel Tank Mounting Plate
 
 Photo -14,15    Ignition & Radio Switch Mounts
 
 Photo -16    Fuse
 
 Photo -17,18    Servo Lead Paper Tube Construction & Completed Tubes
 
 Photo -19    Carbon Spinner from Pete Model
 
 Photo -20    Rails for Throtle & Rudder Servos, 2 Battery mounts on lowwer rails, RX mount on upper railsModel
 
 Photo -21    K&S 86V Pipes
 
 Photo -22    Servo Arms from Nelson Hobbies + other Misc. Hardware for Rudder PullPull
 
 Photo -23    Rudder Pull Pull Bellcranks
 
 Photo -24    Rudder Control Horns
 
 Photo -25    Rudder Control Horn Cut-Out
 
 Photo -26    Rudder Control Horn Trial Fit
 
 Photo -27    I wasn't happy with the flex headders so I cut them up and brazed these together
 
 Photo -28    Headers & Cans Installed
 
 Photo -31 & 32    Aileron Servos Installed
 
 
 |